115TcTechnetiumm
Z:  
Z = 43N = 72
N:  

Setting ID1 Yield 2
[pps/pnA]
Measurement
date
Beam Target Brho01
[Tm]
F1 slit
L [mm]
F1 slit
R [mm]
Data from
1356.30e-12012-12-08238U 345MeVBe 3mm7.657021.164.2 ---
1383.21e-32012-11-26238U 345MeVBe 3mm7.931022.064.2 ---
2508.17e+02008-11-21238U 345MeVBe 3mm7.990064.264.2J. Phys. Soc. Jpn. 79, 073201 (2010)
2521.47e+12007-05-28238U 345MeVBe 7mm7.250021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)
2546.76e+02007-05-23238U 345MeVBe 7mm7.396021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)



Publication
Title Journal First Author
β-delayed neutron emission of r-process nuclei at the N = 82 shell closurePhys. Lett. B 816, 136266 (2021)O. Hall


 Annotations:
1 Detailed BigRIPS setting is shown in the linked page.
2 The list of primary beam intensities is given in this page.
3 Error is only statistical one. Systematic error is estimated within 30%, which comes from uncertainly of primary beam intensity.


Return