89AsArsenic
Z:  
Z = 33N = 56
N:  

Setting ID1 Yield 2
[pps/pnA]
Measurement
date
Beam Target Brho01
[Tm]
F1 slit
L [mm]
F1 slit
R [mm]
Data from
117.94e-22017-11-01238U 345MeVBe 4mm8.271953.564.2 ---
1075.99e+02014-11-06238U 345MeVBe 4mm8.087064.264.2 ---
1085.62e+02014-11-03238U 345MeVBe 4mm8.087064.264.2 ---
2519.02e+02008-11-08238U 345MeVBe 5mm7.901064.264.2J. Phys. Soc. Jpn. 79, 073201 (2010)
2526.53e+02007-05-28238U 345MeVBe 7mm7.250021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)
2535.87e+02007-05-26238U 345MeVBe 7mm7.634042.042.0J. Phys. Soc. Jpn. 77, 083201 (2008)
2544.48e+02007-05-23238U 345MeVBe 7mm7.396021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)



Publication
Title Journal First Author
Impact of Newly Measured β-Delayed Neutron Emitters around 78Ni on Light Element Nucleosynthesis in the Neutrino Wind Following a Neutron Star MergerPhys. Rev. Lett. 134, 172701 (2025)A. Tolosa-Delgado
Triaxiality of neutron-rich 84,86,88Ge from low-energy nuclear spectraPhys. Rev. C 96, 011301R (2017)M. Lettmann

Experiment
Proposal No. Spokesperson Start-Date End-Date Beam Course
NP1312-RIBF118R1P. Doornenbal, A. Obertelli2015-04-272015-05-08238U 345 MeV/u ZeroDegree


 Annotations:
1 Detailed BigRIPS setting is shown in the linked page.
2 The list of primary beam intensities is given in this page.
3 Error is only statistical one. Systematic error is estimated within 30%, which comes from uncertainly of primary beam intensity.


Return