103SnTin
Z:  
Z = 50N = 53
N:  

Setting ID1 Yield 2
[pps/pnA]
Measurement
date
Beam Target Brho01
[Tm]
F1 slit
L [mm]
F1 slit
R [mm]
Data from
1754.90e+02011-12-17124Xe 345MeVBe 4mm5.300042.832.1Nucl. Instrum. Methods Phys. Res., Sect. B 317, 756 (2013)
1771.10e+02011-12-15124Xe 345MeVBe 4mm5.362042.842.8Nucl. Instrum. Methods Phys. Res., Sect. B 317, 756 (2013)
1781.90e+12011-12-15124Xe 345MeVBe 4mm5.417042.842.8Nucl. Instrum. Methods Phys. Res., Sect. B 317, 756 (2013)
1791.60e+12011-12-15124Xe 345MeVBe 3mm5.468042.842.8Nucl. Instrum. Methods Phys. Res., Sect. B 317, 756 (2013)



Experiment
Proposal No. Spokesperson Start-Date End-Date Beam Course
MS11-03T. Kubo2011-12-122011-12-18124Xe 345 MeV/u BigRIPS


 Annotations:
1 Detailed BigRIPS setting is shown in the linked page.
2 The list of primary beam intensities is given in this page.
3 Error is only statistical one. Systematic error is estimated within 30%, which comes from uncertainly of primary beam intensity.


Return