77CuCopper
Z:  
Z = 29N = 48
N:  

Setting ID1 Yield 2
[pps/pnA]
Measurement
date
Beam Target Brho01
[Tm]
F1 slit
L [mm]
F1 slit
R [mm]
Data from
112.09e-32017-11-01238U 345MeVBe 4mm8.271953.564.2 ---
122.26e+12016-11-09238U 345MeVBe 5mm7.596050.050.0 ---
133.88e+02016-11-09238U 345MeVBe 7mm7.843440.040.0 ---
141.49e+12016-11-09238U 345MeVBe 7mm7.723750.050.0 ---
585.12e+12015-11-04238U 345MeVBe 7mm7.322964.264.2 ---
1085.85e-62014-11-03238U 345MeVBe 4mm8.087064.264.2 ---
1349.72e-12012-12-17238U 345MeVBe 3mm8.244042.864.2Phys. Rev. C 95, 051601R (2017)
2511.45e+12008-11-08238U 345MeVBe 5mm7.901064.264.2J. Phys. Soc. Jpn. 79, 073201 (2010)
2529.36e+02007-05-28238U 345MeVBe 7mm7.250021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)
2531.23e+12007-05-26238U 345MeVBe 7mm7.634042.042.0J. Phys. Soc. Jpn. 77, 083201 (2008)
2548.09e+02007-05-23238U 345MeVBe 7mm7.396021.021.0J. Phys. Soc. Jpn. 77, 083201 (2008)



Publication
Title Journal First Author
Prominence of Pairing in Inclusive (p,2p) and (p,pn) Cross Sections from Neutron-Rich NucleiPhys. Rev. Lett. 122, 162503 (2019)N. Paul
Nuclear structure of 76Ni from the (p, 2p) reactionPhys. Rev. C 99, 014312 (2019)Z. Elekes

Experiment
Proposal No. Spokesperson Start-Date End-Date Beam Course
NP1406-RIBF126E. Sahin2015-04-072015-04-12238U 345 MeV/u ZeroDegree


 Annotations:
1 Detailed BigRIPS setting is shown in the linked page.
2 The list of primary beam intensities is given in this page.
3 Error is only statistical one. Systematic error is estimated within 30%, which comes from uncertainly of primary beam intensity.


Return