64NiNickel
Z:  
Z = 28N = 36
N:  

Setting ID1 Yield 2
[pps/pnA]
Measurement
date
Beam Target Brho01
[Tm]
F1 slit
L [mm]
F1 slit
R [mm]
Data from
208.21e+42016-11-05238U 345MeVBe 3mm6.271350.050.0 ---
216.04e+42016-11-05238U 345MeVBe 7mm6.487350.050.0 ---
222.97e+42016-11-05238U 345MeVBe 1mm6.271350.050.0 ---
1122.05e-32013-06-30124Xe 345MeVBe 4mm5.110064.2-5.0 ---
1134.51e-32013-06-30124Xe 345MeVBe 4mm5.110064.230.0 ---
1145.35e-52013-06-29124Xe 345MeVBe 4mm5.110064.20.0 ---
1161.30e-22013-06-28124Xe 345MeVBe 4mm5.110064.210.7 ---
1172.47e-22013-06-28124Xe 345MeVBe 4mm5.110064.210.7 ---



Experiment
Proposal No. Spokesperson Start-Date End-Date Beam Course
MP2012-RIBF201M. Tanaka2025-06-022025-06-08238U 345 MeV/u ZeroDegree
NP1412-RIBF123R1M. Takechi2016-11-042016-11-10238U 345 MeV/u BigRIPS


 Annotations:
1 Detailed BigRIPS setting is shown in the linked page.
2 The list of primary beam intensities is given in this page.
3 Error is only statistical one. Systematic error is estimated within 30%, which comes from uncertainly of primary beam intensity.


Return